Fill Dirt Calculator — Loose Yards and Tons

Convert the desired finished fill prism into loose delivered soil, accounting separately for settlement and handling waste.

Formula reviewedJuly 23, 2026Inputs stay on your device
Enter your measurements
US customary units
Inputs stay on this device. Saved work syncs privately only when you choose to sign in; shared links include only the measurements in that link.
Option lab

Compare up to three scenarios

Capture the current result, change one or more inputs, and see the options side by side. The first option becomes your baseline.

0/3 in this page session

Your live calculator remains unchanged. Capture it only when you want a comparison point.

Saved comparisonsKeep an option set on this device and resume it later.
0 saved
Device-local project

Save this estimate as a project section

Name rooms, roof planes, yard areas or other sections separately. CalcurHome will combine compatible results from this calculator on this device.

No account or personal information required. Data remains in this browser until you delete it or clear browser storage.

View all saved project estimates

Embed this calculator

Add the live, responsive calculator to an HTTPS website. Visitors can change measurements inside the embed; the full CalcurHome page remains the source for formulas, guidance and limitations.

Preview embed

01

What does the fill dirt calculator calculate?

Calculate finished fill from length, width, and average compacted depth, then increase it for settlement and construction waste. Finally multiply loose yards by supplier density for estimated tons. Fill requirements should come from verified grades; this quantity tool does not address bearing, compaction testing, drainage, or contamination.

02

Loose fill dirt formula

Loose yd³ = length × width × average finished depth ÷ 12 ÷ 27 × settlement factor × waste factor; tons = loose yd³ × density.

The geometric volume is the desired finished fill. Settlement estimates loose-to-finished shrinkage, waste covers handling loss, and density provides a preliminary transport weight.

03

How to measure for an accurate estimate

  1. Establish existing and proposed grades at several points before estimating average fill depth.
  2. Divide sloped or variable fills into smaller zones rather than using one maximum depth.
  3. Exclude foundations, drainage structures, utilities, or retained voids from the simple soil prism.
  4. Confirm loose density and expected shrinkage with the supplier or project earthwork data.
04

Shallow backyard grade correction

A 30 ft by 20 ft zone averages 8 in finished fill, with 20% settlement, 5% waste, and 1 ton/yd³.

Finished volume is 14.81 yd³; the loose order is about 18.67 yd³, estimated at 18.67 tons.
05

Before you purchase material

  • Specify clean or engineered fill requirements; do not accept unknown material based only on price.
  • Verify source, soil classification, debris limits, and environmental documentation as appropriate.
  • Plan lift placement, moisture conditioning, compaction equipment, and testing before delivery.
  • Confirm truck access and legal load size, then schedule deliveries at a controllable rate.
06

Common questions

How much does a cubic yard of fill dirt weigh?

The calculator defaults to one ton per loose cubic yard, but real weight varies with soil type, rock content, organic matter, and moisture. Use supplier scale records or test data when payload, structural loading, or cost is sensitive to weight.

What is the difference between fill dirt and topsoil?

Fill is selected mainly to occupy volume and meet grading or engineering requirements, while topsoil is intended to support plants near the surface. Product labels vary, so specifications, classification, cleanliness, and test results matter more than the seller’s name.

How much does fill dirt settle?

Settlement is project-specific. Soil type, initial looseness, moisture, lift thickness, compaction effort, and underlying ground all affect shrinkage. Twenty percent is a rough planning input, not a design value. Structural fill should follow specified placement and density testing.

Can I use fill dirt to fix yard drainage?

Regrading may help, but adding soil without a drainage plan can redirect water toward buildings or neighbors. Establish legal discharge, required slopes, utilities, and floor or foundation clearances first. Local permits or professional grading design may be necessary.

07

Sources and reference standards

See every citation and the calculators that use it in the calculator source index.

Did this calculator help you make the next project decision?