Free project planning tool

Concrete Footing Calculator

Estimate a continuous strip footing with one total length and uniform cross-section. Use approved dimensions for any structural or permitted foundation.

Formula reviewedJuly 23, 2026Inputs stay on your device
Enter your measurements
US customary units
Inputs stay on this device. Saved work syncs privately only when you choose to sign in; shared links include only the measurements in that link.
Option lab

Compare up to three scenarios

Capture the current result, change one or more inputs, and see the options side by side. The first option becomes your baseline.

0/3 in this page session

Your live calculator remains unchanged. Capture it only when you want a comparison point.

Saved comparisonsKeep an option set on this device and resume it later.
0 saved
Device-local project

Save this estimate as a project section

Name rooms, roof planes, yard areas or other sections separately. CalcurHome will combine compatible results from this calculator on this device.

No account or personal information required. Data remains in this browser until you delete it or clear browser storage.

View all saved project estimates

Embed this calculator

Add the live, responsive calculator to an HTTPS website. Visitors can change measurements inside the embed; the full CalcurHome page remains the source for formulas, guidance and limitations.

Preview embed

01

What does the concrete footing calculator calculate?

Multiply the footing’s total centerline length by its width and depth, converting inches to feet, then divide by 27 for cubic yards. Add a placement allowance for trench variation. This tool estimates volume only; footing size, reinforcement, frost depth, and bearing require professional or code verification.

02

Continuous rectangular footing volume

Cubic yards = total length × (width in inches ÷ 12) × (depth in inches ÷ 12) ÷ 27

Width and depth form the footing cross-section in square feet. Multiplying by total length gives cubic feet; the calculator converts this to yards and adds the chosen trench allowance.

03

How to measure for an accurate estimate

  1. Use approved footing width and depth rather than the visible trench alone.
  2. Measure total length using a consistent centerline or segment method so corners are counted once.
  3. Calculate stepped footings and sections with different cross-sections separately.
  4. Measure over-excavation before the pour because soil collapse can materially increase concrete volume.
04

Continuous perimeter footing

An 80 ft footing is 16 inches wide and 8 inches deep, with 10% trench allowance.

80 × (16 ÷ 12) × (8 ÷ 12) ÷ 27 = 2.63 cu yd; order estimate = 2.90 cu yd.
05

Before you purchase material

  • Arrange required footing inspection before ordering concrete or covering reinforcement.
  • Confirm mix specification, placement access, pump needs, and allowable construction joints.
  • Have forms, reinforcement, chairs, anchor items, tools, crew, and washout ready before delivery.
  • Budget delivery and short-load fees separately from the displayed material subtotal.
06

Common questions

How do I measure the length of a continuous footing?

Use the plan’s centerline dimensions when available. Otherwise divide the footprint into non-overlapping straight segments and document how corners are handled. Mixing inside, outside, and centerline lengths can double-count or omit concrete at intersections.

How much extra concrete should I allow for footings?

Formed footings may need less extra than earth-formed trenches. Ten percent is a planning starting point when soil variation exists, but actual allowance depends on excavation control, collapse, pumping, and supplier increments. Measure the trench before ordering.

Can this calculator determine footing width or depth?

No. It calculates concrete from dimensions you already have. Required width and depth depend on loads, soil bearing, frost conditions, seismic or wind design, and code. Obtain approved dimensions from a qualified professional or local building authority.

Do I include rebar volume when ordering footing concrete?

Concrete estimators normally do not deduct reinforcement displacement because the difference is small relative to placement variation. Order from the full geometric volume and calculate reinforcing steel separately from approved plans, including laps, bends, and supports.

07

Sources and reference standards

See every citation and the calculators that use it in the calculator source index.